04-06-2013 Assembly - EV-Fun
651
page-template,page-template-full_width,page-template-full_width-php,page,page-id-651,page-child,parent-pageid-440,theme-capri,qode-core-2.1.2,select-core-2.1.2,woocommerce-no-js,ajax_fade,page_not_loaded,,capri-ver-3.4, vertical_menu_with_scroll,smooth_scroll,fade_push_text_top,paspartu_enabled,woocommerce_installed,blog_installed,wpb-js-composer js-comp-ver-6.7.0,vc_responsive
 

04-06-2013 Assembly

Todays work:

  • Removed 3 mm from the lower plates to make sure the combined plate thickness is correct.
  • Inserted key for motor sprockets and adjusted chain.
  • Assembled nylon plates and aluminum.
  • Cut of one plate to make room for brake cylinder.
  • Planned BMS system placemement in the cell grid.
  • Grinded alu plates for batteries. Checked the position of plates in the grid.